Skip to main content
Albemarle Logo
File #: 26-177    Version: 1 Name:
Type: Resolution Status: Consent Agenda
File created: 1/28/2026 In control: Board of Supervisors
On agenda: 4/15/2026 Final action:
Title: Free Bridge Lane Discontinuance Resolution.
Attachments: 1. Att.A - Free Bridge Lane Discontinuance Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
AGENDA DATE: 4/15/2026

TITLE:
Free Bridge Lane Discontinuance Resolution

SUBJECT/PROPOSAL/REQUEST: Resolution to request the discontinuance of Free Bridge Lane

ITEM TYPE: Consent Action Item

STAFF CONTACT(S): Richardson, Wall, Svoboda, Tevendale, Barnes, McDermott, Swartzendruber, Karina-Plun

PRESENTER (S): Alberic Karina-Plun

LEGAL REVIEW: Yes

REVIEWED BY: Jeffrey B. Richardson

BACKGROUND: Free Bridge Lane is a low-volume, unstriped roadway that extends approximately one-half mile from Darden Towe Park to US 250. The 2019 Pantops Master Plan envisioned transitioning Free Bridge Lane from its current condition to a "Green Street" with enhanced bicycle and pedestrian infrastructure and elements of stormwater management. Free Bridge Lane was prioritized in the Pantops Master Plan as a "catalyst" project.

In 2023, a feasibility study was conducted to assess creating a multiuse pedestrian trail along the western edge of Free Bridge Lane. Staff worked with consultants, other County departments, the Virginia Department of Transportation (VDOT), local stakeholder groups, and community members to develop a concept for closing Free Bridge Lane to vehicular traffic and turning it into a pedestrian promenade. A pilot project to determine the desirability of closing Free Bridge Lane to vehicular traffic was instituted on November 1, 2024, and ended in October 2025. VDOT conducted traffic volume counts of Free Bridge Lane in August 2024, prior to commencing the pilot project. The study counted pedestrians, bicycles, and vehicles. A second traffic volume count was conducted in spring 2025, and the study found an increase in bicycle and pedestrian trips.

On August 6, 2025, the Board authorized the County Executive to petition VDOT to begin the discontinuance process for Free Bridge Lane. Staff worked with VDOT to determine the extent of the discontinuance. VDOT gave notice to abutting landowners and provided a public comment period for the discontinuance of F...

Click here for full text