Legislation Details

File #: 26-282    Version: 1 Name:
Type: Resolution Status: Public Hearing
File created: 5/5/2026 In control: Board of Supervisors
On agenda: 6/3/2026 Final action:
Title: Public Hearing for Conveyance of Easements across a Portion of County Owned Parcel 78-58L at Free Bridge Lane. To consider conveyance of a portion of the property and easements on county-owned Parcel 07800-00-00-058L0 (Rt 250E Along Rivanna River, Charlottesville, VA 22911) to the Virginia Department of Transportation. This conveyance is to facilitate the construction of U.S. 250 and Route 20 intersection and corridor improvements.
Attachments: 1. Att.A - Right-of-Way Exhibit, 2. Att.B - Existing Conditions Aerial, 3. Att.C - Deed of Gift and Donation, 4. Att.D - Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
AGENDA DATE: 6/3/2026

TITLE:
Public Hearing for Conveyance of Easements across a Portion of County-Owned Parcel 78-58L at Free Bridge Lane.

SUBJECT/PROPOSAL/REQUEST: Public Hearing for Conveyance of Easements across a Portion of County-Owned Parcel 78-58L (Free Bridge Lane) for a VDOT Transportation Improvement Project

ITEM TYPE: Regular Action Item

STAFF CONTACT(S): Richardson, Wall, Herrick, Tevendale, Barnes, McDermott, Swartzendruber

PRESENTER (S): Tonya Swartzendruber

LEGAL REVIEW: Yes

REVIEWED BY: Jeffrey B. Richardson

BACKGROUND: The Board of Supervisors voted to initiate the discontinuation of Free Bridge Lane through the Virginia Department of Transportation (VDOT) on April 15, 2026. Once the discontinuation of Free Bridge Lane is finalized by the Commonwealth Transportation Board (CTB), maintenance responsibility for Free Bridge Lane will transition to the County. Free Bridge Lane extends across County-owned property, parcel 07800-00-00-058L0 (Parcel 78-58L).

VDOT is constructing the Route 20 at U.S. 250 project, which is a SMART SCALE-funded project. This project includes dedicated turn lanes and sidewalk construction along Route 20, installing a raised median along U.S. 250, and upgrading a stormwater facility located between Route 20 and Free Bridge Lane, across Parcel 78-58L.

STRATEGIC PLAN: Infrastructure & Placemaking - Invest in infrastructure and amenities that create connection, opportunity, and well-being.

DISCUSSION: VDOT is requesting construction and maintenance easements across Parcel 78-58L in the alignment of Free Bridge Lane to allow VDOT to construct the Route 20 at U.S. 250 project and maintain the stormwater facility in the future.

Attachment A displays the areas of permanent drainage easement (18,845 square feet, shown in green) and the temporary construction easements (17,419 square feet, orange) VDOT needs for this project. Attachment B shows the existing conditions of the area. Attachment C is the draft De...

Click here for full text